Showing posts with label Projects. Show all posts
BIG NEWS: Microsoft & Salesforce.com Annouce Partnership!!!!!
For those who haven't seen the news that is coming out of the US this evening, Microsoft new CEO Satya Nadella has announced a partnership between Microsoft and Salesforce.com.
This is really REALLY big news....and not particularly great news. For at least 4 years Microsoft have had SalesForce in their sights. In 2010 it really kicked off when law suits were filed for "patent infringements" To say SalesForce were equally "miffed" was an understatement
In last 2 years in particular, it seemed that Microsoft's singular commercial goal was to wipe SalesForce off the map. Even Microsoft's pricing strategy for CRM Online (MS CRM Professional Licence was priced the same as SalesForce "Basic" licence) seemed like an ironic slap in the face to SalesForce
Now Microsoft seem to want to play nice....
Don't.....quite....know what to say really....
On the face of it, this is not a smart move AT ALL. Integrating SalesForce and Office365 surely removes what should be a core USP of Microsoft Dynamics CRM. Also, does Microsoft REALLY want to present SalesForce as a good solution to Office365 customers looking for a CRM Solution??
There is one possibility but it rely's on Microsofts new CEO Satya Nadella being sharper than initially appears. If this was a bold first move to an acquisition of SalesForce by Microsoft this could make for more drama than a CRM Industry version of Eastenders. Even without an acquisition, there could be a positive angle. SalesForce do have a significant customer base. Get them on Office365, impress them with SharePoint and OneDrive and...."oh by the way...did you know that Microsoft Dynamics CRM is way more awesome than this SalesForce rubbish????"
Am I trying to put a positive spin on this? Yes...but time will tell.
Needless to say this hasnt been met with much enthusiasm in the twittersphere...
Please feel free to use the comments section to discuss your insights/thoughts on this.
Thanks
Joel
Now Microsoft seem to want to play nice....
Don't.....quite....know what to say really....
On the face of it, this is not a smart move AT ALL. Integrating SalesForce and Office365 surely removes what should be a core USP of Microsoft Dynamics CRM. Also, does Microsoft REALLY want to present SalesForce as a good solution to Office365 customers looking for a CRM Solution??
There is one possibility but it rely's on Microsofts new CEO Satya Nadella being sharper than initially appears. If this was a bold first move to an acquisition of SalesForce by Microsoft this could make for more drama than a CRM Industry version of Eastenders. Even without an acquisition, there could be a positive angle. SalesForce do have a significant customer base. Get them on Office365, impress them with SharePoint and OneDrive and...."oh by the way...did you know that Microsoft Dynamics CRM is way more awesome than this SalesForce rubbish????"
Am I trying to put a positive spin on this? Yes...but time will tell.
Needless to say this hasnt been met with much enthusiasm in the twittersphere...
Please feel free to use the comments section to discuss your insights/thoughts on this.
Thanks
Joel
Friday, 30 May 2014
Posted by Unknown
The Million Dollar Question - How To Get Buy In! - Part 2 (End Users)
If you read the
second article in our 3-part series on how to get buy-in for your CRM project.
Part 1 of the series focused on getting management teams on board. If you
missed it, go and have a look here. In this article we will discuss what is
probably your toughest audience for getting buy-in…
- End Users - Getting buy-in from the day-to-day users of CRM can be a huge challenge. Some users are very resistant to change. Others, are desperate to cling onto the existing system. Ironically, these users often are hugely critical of the way things are done, but when change is on the horizon suddenly the current way is the best way! Still, yet others are either "too busy" or just plain uninterested.
Been there? Done it?
Got the t-shirt? Like with management, In my experience there is no standard
formula for success with getting buy-in from end users, and a tailored approach
is a must. As they are probably your biggest group, you may need to adapt your approach for
different teams of users so you will need to be very flexible . So what
measures are available to you?
Measure - Issue Initial Feedback Questionnaires
- Who For - End Users
- What To Do - Simply inviting
users to a session to discuss CRM without any 'warm-up' will
ensure noting
other than a very dry boring meeting. To combat this, issue an
initial feedback questionnaire to the team asking them questions such as,
what do they currently do in their day to day job? What systems do they
use? What would they like to change? Etc. The purpose of these is not for them to write down
all their requirements but to get them thinking before they come into the
feedback sessions, making those sessions much more productive
Measure - Empower Users To Take Responsibility
- Who For - End Users
- What To Do - We discussed this in our last article as a strategy that benefits the management team but in truth it is a huge way to get buy-in from end users too. User will feel much more engaged in the entire process and get on board with process changes quicker if they feel that they have the power to make suggestions and decisions that are taken on board. This can be done by asking Power-Users to sign-off functionality before it gets developed. This often also has the knock on effect of making these individuals an advocate of the system when it is deployed
Measure - Do What You Said You Would When You Said You Would
- Who For - End Users
- What To Do - We discussed this in our last article as a strategy that benefits the management team but in truth it is a huge way to get buy-in from end users too. Often a project of this size is the next in a list of IT implementations, systems, processes etc. and you may find that previous promises made that were never delivered can impact users view of your project. The simplest and quickest way to get round this is to do what you said you would when you said you would. Cancel/Rearrange meetings as rarely as possible.
Measure - Carry Out Dual-Phase UAT
- Who For - End Users
- What To Do - UAT is essential and yet it can often be where a project really slows, sadly so close to the finish line! To combat this, carry out 2 phases of UAT. The first phase should be carried out with the project lead with the purpose of verifying that what has been delivered meets what was requested in the documented solution. The second phase is where the system is verified with the end-users, checking that nothing major has been missed or not delivered.
Measure - Process Oriented Training Materials
- Who For - End Users
- What To Do -Avoid simply handing users manuals that cover only the basics of CRM or worse the detailed minutia of how to administer CRM. This will bore your users and turn them off your system. Instead, create manuals and training programs that focus on how the user groups will follow the company process. Accompanied with screen-shot manuals, this approach will make users feel empowered to do their job confidently in CRM from day 1.
Measure - Make Good Use Of Videos
- Who For - End Users
- What To Do - It’s a nightmare getting all the individuals you need together for training. Using screen capture software to create short videos that demonstrate how to use certain aspects of the system can be a great way of not only mopping up those who couldn’t attend but also providing a first stop for users wanting a refresh on something from the training. Top Tip: Keep them short! Users are much more likely to watch a video if it is 3-5 mins. long
Measure - Run Project Feedback Sessions
- Who For - End Users
- What To Do - Throughout the project, run project feedback sessions to not only gather feedback from end users on how things are going from their perspective but also to give them feedback on how the project is progressing. There can be quite a gap between stages for the end users, particularly during the development phase. Keeping them up-to-date on progress will reinforce that their hard work and input hasn’t been forgotten.
None of these alone
will guarantee success. Much depends on the size of your organisation and a
realistic view of what is achievable. However, using a combination of these
will really help your users feel engaged with and when end users feel like they
have a say in the project this is only a positive thing.
But what about
getting buy-in from an often forgotten area, the IT department? This will be
discussed in the final article in our series out on Tuesday
If you are
struggling with user adoption and would like some help and support, we would
welcome the chance to discuss this further with you. We have worked with
thousands of users over the years and we are confident that we can help support
you. To arrange a discussion, please complete the Contact Us page
Hope this helps,
please feel free to add any comments below.
Joel Abbott - xRM
Consultant.
Friday, 23 May 2014
Posted by Unknown
The Money Pit of CRM Deployment! Delivering On-Time And In-Budget

Do you remember the film The Money Pit? Tom Hanks & Shelly Long star as home renovators who start with big dreams for their new home ultimately to realise that it will suck every penny from their lives.
Why are we talking about this? Many businesses would agree that, all too easily, an IT Project can become a Money Pit in its own right. Even the BBC has suffered from what the city calls "White Elephant Syndrome". They paid over £100 million for an IT project called the Digital Media Initiative (DMI) that was intended to move the BBC away from using and storing video tape, sounds simple enough? Not so. After 5 years and producing "almost no results" it was branded a complete failure.
Now as we sit smugly (before realising that the £100 million came from YOUR TV licence) reflecting on the failures of the poor BBC IT Dept. ask yourself, is this really so difficult to do? On more than just a few of the projects i have worked on, the reason we have been brought in is because the project is over-budget, behind schedule and no where near being delivered. Why? There can be any number of reasons from bad management of resources and poor planning to bad technical choices. So if your planning to implement a CRM solution, how do you get it right? Here a four key points that you need to seriously consider:
Choose The Right Product
One customer came to us having spent over £150,000 on a CRM solution. Once the first phase of the project was over, they were told by the product vendor that no further development could be done on the solution meaning they were stuck with what they had. And you guessed it....what they had been left with was not fit for purpose! This example clearly shows how important it is to choose the right product. Any product that is selected should be both flexible enough to accommodate what you want from it now but also have enough scope to grow with your business. The only product that truly fits the bill in this regard is Microsoft Dynamics CRM. I have implemented Microsoft Dynamics CRM for small businesses and major UK corporations. Microsoft Dynamics CRM is flexible, easily customised and extended with products from the huge amount of ISV's making custom solutions to suit your needs.
In addition, any product should provide value for money. Microsoft have clearly taken a view that providing their customers with huge value for money over making a quick buck is the way to go. This can be seen from the huge improvements and additional functionality that Microsoft are including for free as part of the update roll-ups.
Choose The Right Partner
This is one of the most important decisions you will make and can be the difference between success and failure. A good partner with extensive experience can guide you through the decision making process and help you to avoid the pitfalls. A bad partner can not only prevent your solution from being delivered but cost you the earth! So what should you look for? 3 things...
First, your partner must have relevant experience that you can independently measure. Ask your potential partner for a client list and ask how many would be willing to provide a reference. The right response is "you can speak to any of our customers!" When you do speak to them, don't be afraid to ask hard questions (Deliver on time? What were they like to work with? Were their cost estimations accurate?). Second, your partner must be easy to get along with. Before you dismiss this as a nice-to-have, trust me, its crucial. You will be spending A LOT of time with your chosen partner and especially the project liaison. At times you will see them more than your family so if your project liaison is an idiot it will seriously impede the smooth running of your project so ask for your project liaison to be included in meetings right from the start.
Finally, take a holistic view of partner selection. In comparing partners, so many organisations will focus on only the the technical aspects of the offering from each partner, or even worse focus solely on the price. Take into consideration all aspects of the offering that the partner provides (Experience, Approach, Cost, Company History & Ethics, Training Experience etc...) Doing this may mean you don't select the cheapest option, but this will cost you far less by the end of the project. I'm sure there are many other things that you can think of when selecting a partner but these have shown themselves to be basic essentials.
Choose The Right Approach
Historically, the classic software delivery approach was known as the "Waterfall" approach. Waterfall basically refers to the following:
- Perform a high level scope of the requirements
- Review with client
- Perform more detailed requirements gathering
- Outline the detailed solution proposed
- Develop the entire solution
- Go Live!
I realise that this is perhaps a little simplified but in short, what this means is that you gather the requirements (no matter how extensive), develop it, then deliver it.Sounds good yeah? It is with one problem. Generally speaking, the requirements are so extensive that the development period takes 6 month plus. This means that in between gathering the requirements and finishing the development 6-8 months at least has passed! Most organisation will have changed or adjusted their processes 2 or 3 times during that period meaning some (and at worst ALL) of your changes are no longer valid. To deal with this you may hear partners talking about using an Agile project methodology. An Agile methodology involves making small iterative changes and regularly reviewing these with the user who requested it. This means that your project can handle changes much more effectively. However, be cautious. A number of organisations i have worked with have found that while Agile helps them adapt and deliver small changes quickly, its all too easy to lose sight of the bigger picture. A solution can grow organically and unless there is a tight control on the changes that focuses on the bigger project aim, you can find yourself spending the same money but having a system that is a mish-mash of functionality from users, some of whom may no longer even be with you anymore.
To combat this, i recommend my customers to adopt a combination of the best of both:
- Take the time to conduct a proper and full requirements gathering exercise
- Document clearly all changes that have been requested and prioritise these both by the business benefit and cost
- When documenting the solutions add 30% of the development time on top to review the changes with the user. This includes allowing them to be engaged and make minor modifications
- With all parties, and based on the priorities divide, the requirements up into project stages. It really doesn't matter if you have 2 or 200 stages, but these must be manageable and generally deliverable within a 2 month period.
- Have weekly and monthly reviews of project progress
- As each part of the solution is developed, use the time allotted earlier to engage with the users allowing them to verify what you are doing. This will also reduce the amount of time required for UAT and Training
- Any change that requires a larger modification should be removed from the current phase and re-scoped preventing any lag on delivery of the current phase.
There are still pitfalls to be found, but in general i find that this approach gives a good mix of the two project management models allowing you to get the best from both.
Plan Your Work, Work Your Plan
Its not new, but this old adage applies here and particularly in the requirements gathering phase. Take as much time as you can in gathering the requirements and getting these signed off before you start development. This isn't as easy as it sounds. The moment a project is started, senior management will be champing at the bit to see "something" for all the work that is going on. This isn't easy but its absolutely essential to not allow the initial planning stages to be rushed. No one will thank you for rushing into development and not delivering what is truly needed or nothing at all, least of all senior management. One client i worked with on a project spent 6 months gathering requirements, making organisational changes, running focus groups, reviewing the proposed solutions before starting development. The development process only lasted 3 months. On paper, this seems crazy and yet the project was delivered on time, within budget and with functionality that provided real benefits.
Conclusion
If you would like any help with your project please don't hesitate to contact me.
Joel Abbott - Managing Director
xRM Consultant
Saturday, 12 April 2014
Posted by Unknown
What Makes A Successful CRM Project?
How would you measure success in your CRM project?....For many of us that, contrary to what Mr Shakespeare would have us believe, is the question.
The answer? Well, in truth, this is no single right answer. Often each department, or even individual will have their own idea of what a successful CRM project look like for them.However, what fascinates me is that so many companies often embark on large scale CRM projects without taking the time to truly outline what will be viewed as success. The management team see a business issue, perhaps relating to cost or efficiency, and jump for a quick "fix". "Hey, everybody is using this CRM thingy....we should do that!". The only trouble is that partner's are enlisted, budgets agreed and scope documents signed off before anyone has actually asked "Why do we actually need this again?".
This probably sounds very much like an odd thing to say for a CRM Consultant who spends his life encouraging people to implement CRM. However, implementing it for the right reasons, with clear business objectives is essential. Only then can you truly define true success, see measurable improvements and significant ROI.
What does failure look like? Now that's a different story! Everybody has clear in mind what failure is (Going over budget, missing deadlines...) but that too is often very subjective and is often nothing to do with the objectives of the project. So, without getting any more philosophical, what can an organisation who is implementing a CRM solution do to ensure that their project is successful?
Take Your Time
I chaired a discussion with over 30 delegates at a UK Housing Association conference last week on implementing CRM. When asked what they wanted to get out of our session, one delegate commented "To get it right first time with our CRM deployment".....Good answer
The only way to achieve this is to take your time in the first stages of any project. Rather than coming out of the meeting where you have identified your issue, reaching for Google and searching for CRM companies, take the time to really think about what the issues you are facing are. Identify the issues clearly and the solutions become more defined. Then, document what you would like to achieve from deploying a CRM solution, even writing a list of 2-3 key bullets of what are must-haves for the project to be a success.
Reaching back for Google yet? Hold on! Take the time to think about the wider business. If you are going to invest the time money and effort into a CRM project, why not see what else you can achieve whilst doing it? Can you bring teams that are working in disparate systems together and enable information sharing? Can you drive efficiency in areas that perhaps you would not expect (i.e warehouse, accounts dept...). Doing all of this takes time, time you may not think you have. But take it from one who has seen CRM projects rushed through by managers desperate to resolve their issues, if you don't take your time, you will pay the price down the line.
The time spent at this stage will save days even weeks of time resolving issues during or even after go-live.
Establish A Project Team
Now you have a clear view of your requirements. Ready for Google now? Not yet! Armed with your requirements and project objectives, establish an internal project team. I cannot emphasis enough how important this is. A good, well balanced (we'll come to that in a moment) and engaged project team can literally be one of the biggest factors in the success or failure of a project.
But who should make up this team? Your first inclination may be to involve all the people who have been involved in your discussions so far, or people who agree with your view on things. This is not always the best selection criteria and really any project team should be balanced. Your project team should have people from all areas and levels of the business with varying experience. Fresh ideas can come from the most unlikely of places. At a high level any project team should have:
A strong, driven Project Lead - This individual will be the first to read the documentation cover to cover and the last person to leave the night before go-live. They will get to know the system and therefore your business process inside out. They need to have the skills to draw out of people what they need and the strength to say no when asked for things that could derail the project. Clearly, this person is the most important member of the team and wouldn't normally be a member of senior management (trust me, you wont have the time)
At least 2 members of the senior management team as Project Sponsors. There is nothing more frustrating for this team of individuals who are working hard to make the system a success if there is no buy-in, perceived or actual, from the people at the top. They need to know that their hard work, often on-top of what they do as a day job, will not be for nothing. The individuals chosen to fulfill the project sponsor role must also have a key quality: They must actually care about and be invested in the project aims. I mean no offence, but there is no point in asking the VP of manufacturing to do this if the project will not impact his area of the business in anyway. In addition, even though as senior management they will be extremely busy, they must commit to attending the project meetings. This is crucial if the project is to be a success.
Project Champions from each affected department. These also must be chosen carefully. You are looking for people who are "up for it" and willing to really get stuck in and provide good feedback. These individuals need to know the processes carried out by their area of the business inside out as you need them to bring to the team all the scenario's and "What if's" that everyone else isn't aware of or would forget. In addition, really investing in these people, getting them involved in revisions of the scoping documentation and even asking them to sign-off the relevant parts will give your project a strong presence in each department meaning when things aren't going to plan post-deployment (which always happens no matter how good you are) your project lead isn't running around the building having a meltdown.
Getting the right people in place will be a major factor in a successful implementation.
Chose The Right Partner
Choosing the right consultant/organisation to handle your project is crucial. This person(s) is going to be your guide on so many things for what could be up to a year, the relationship needs to be strong. You need a partner who will support you through the changes that your business will go through during the project. You need a partner who will take the project as seriously and invest as much of themselves as you will. Obviously this comes at a cost, but a good partner can be worth their weight in gold.
What should you look for? A good partner will have a strong track record of delivery and be willing to let you talk to previous clients. They should also be able to assign you a main contact who is technical, who you can bounce ideas off when you need. They should also be easy to get along with. I know that sounds strange, but you will be putting these people in front of a large proportion of your staff. They need to present a positive and supportive attitude and, where possible, be easy to engage with. Your not looking for a partner who wants to make a quick buck and run.Your CRM partner will get to know your business processes better than you do and going forward as your business develops your solution can do so to with the support of a partner who knows you and your ethos.
Chose The Right Technology
There are plenty of CRM solutions out on the market so how do you chose? Your partner can be helpful in this but of course they may be aligned with a particular vendor. Whatever solution you need to be know firstly that it will fulfill your expectations technical. For example, will you have remote workers who will need mobile capability? Do your process allow for your to fit with what the solution offers or is it crucial that it can be customized to suit your processes? Do you have the infrastructure to host the solution or are you looking to go into the cloud? Are you looking to replace other solutions and bring them into a central solution which may then require integration with other elements? All of these questions must be answered clearly before you can proceed. If your reading this you know that my focus is on Microsoft Dynamics CRM and it truly stands apart in this regard. Sales pitch aside, you will need a technology platform that can deliver not just today's needs but tomorrow's. It needs to be able to be flexible and grow with your business, as you change, it changes. Microsoft Dynamics fits this perfectly and with Microsoft Dynamics CRM 2013 it takes it to a whole new level.
So, how do you measure success in a CRM project? Actually, only you can answer that. However, what is clear is that answering that question, setting your critical success factors before you do anything else, is almost the answer itself.
xRM Consultant (UK) Ltd provide consultancy services in all areas of Microsoft Dynamics CRM Projects. If you would like to discuss your requirements please contact us - enquiries@xrmconsultant.co.uk
Joel
Tuesday, 29 October 2013
Posted by Unknown